Medical Professional CCM Exam Syllabus Topics:
| Section | Weight | Objectives |
|---|---|---|
| Rehabilitation Concepts and Strategies | 9% | - Vocational and physical rehabilitation pathways
|
| Ethical, Legal, and Practice Standards | 15% | - CCMC Code of Professional Conduct parameters - Regulatory compliance requirements and frameworks
|
| Care Delivery and Reimbursement Methods | 31% | - Case management concepts, processes, and principles - Reimbursement pathways and utilization management tools
|
| Quality and Outcomes Evaluation and Measurements | 18% | - Caseload calculation metrics and tracking standards - Quality indicator metrics and performance tools
|
| Psychosocial Concepts and Support Systems | 27% | - Client dynamics and social determinants of health
|
Medical Professional Certified Case Manager Certification Exam (CCM) Sample Questions:
Question #1
Which two statements reflect an INCORRECT application of a Golden Principle?
A. Any deletions of General Conditions (GC) must be replaced with Particular Conditions (PC) that cover the same scope, and do not leave any roles, duties, obligations, rights, and risk allocation undefined.
B. When applying the FIDIC Red Book or Yellow Book, the Commencement Date shall be within 60 days after the Contractor receives the Letter of Acceptance, in lieu of 42 days.
C. The Contractor ' s right to suspend work (or reduce the rate of work) effective after giving not less than
3 months (in lieu of 21 days) notice to the Employer.
D. Deleting all the clauses in the General Conditions that refer to the DAAB/DAB.
Question #2
(Under FIDIC Red Book (edition 1999) a notice may be delivered to which two addresses?
Choose all of the correct answers (multiple possibilities).)
A. The address of the Site.
B. The address of the Contractor ' s Representative.
C. The address stated in the Contract Data.
D. The address provided for by the recipient of the notice.
Question #3
FIDIC Red, Yellow, and Silver Books (both editions) contain a provision for the Engineer or Employer to instruct the Contractor to employ a subcontractor, thereby also permitting the Contractor to refuse to employ such proposed subcontractor on the basis of a reasonable objection by a notice. Is this statement true or false?
A. False
B. True
Question #4
Upon review of the revised programme, submitted by the Contractor, if the Engineer (under FIDIC Red or Yellow Books) or Employer (under FIDIC Silver Book) does not give a Notice of Non-Compliance within 14 days after receiving a revised programme, then ... [complete the sentence, thereby considering FIDIC Red, Yellow, and Silver Books (edition 2017)]. (1 correct answer applies)
A. The Engineer shall be deemed to have given a Consent and the revised programme shall be the Programme.
B. The Contractor cannot proceed in accordance with the Programme.
C. The Contractor shall submit a Notice to the Engineer or the Employer reminding him to give its approval on the revised programme.
D. The Engineer is deemed to have no objection to use the revised programme submitted by the Contractor, for the Works.
Question #5
(Golden Principle 2 states that " The Particular Conditions must be drafted clearly and unambiguously. " Which statement best underlines this Golden Principle in relation to the FIDIC Red, Yellow, and Silver Books (both editions)?)
A. Modifications made to the Conditions of Contract during tender negotiations that were only documented in emails between the Parties can be part of the Contract as long as those emails are subsequently included in the List of Contract documents. In such a case, it is not necessary to incorporate those modifications in, for instance, the Particular Conditions.
B. Clarifications to the meaning of tender documents together with answers to tenderers' inquiries made during the tender period by the Employer can be inconsistent. If Sub-Clause 1.5 does not provide for the right order, this Sub-Clause can be amended explicitly or implicitly, and this can be done through any of the documents mentioned in Sub-Clause 1.5.
C. When clarifications are given during the tender period, which might impact several general conditions, it is not necessary to amend all these conditions through the Particular Conditions or to consider which exact general conditions require amendment, as such clarifications are deemed to be self-explanatory.
D. In the Particular Conditions, all changes to the General Conditions must be clearly identified by reference to specific Sub-Clause numbers. Additionally, the Particular Conditions Sub-Clauses must clearly indicate the relationship between the newly introduced text and the corresponding General Conditions Sub-Clauses' original text, e.g., addition, omission, replacement, or amendment.
Solutions:
| Question #1 Correct Answer: B,D | Question #2 Correct Answer: C,D | Question #3 Correct Answer: B | Question #4 Correct Answer: D | Question #5 Correct Answer: D |














926 Customer Reviews
Quality and ValueITCertKing Practice Exams are written to the highest standards of technical accuracy, using only certified subject matter experts and published authors for development - no all study materials.
Tested and ApprovedWe are committed to the process of vendor and third party approvals. We believe professionals and executives alike deserve the confidence of quality coverage these authorizations provide.
Easy to PassIf you prepare for the exams using our ITCertKing testing engine, It is easy to succeed for all certifications in the first attempt. You don't have to deal with all dumps or any free torrent / rapidshare all stuff.
Try Before BuyITCertKing offers free demo of each product. You can check out the interface, question quality and usability of our practice exams before you decide to buy.