ISQI ISTQB Certified Tester Advanced Level - Technical Test Analyst (V4.0) Sample Questions:
1. Assume you are involved in testing a Health Insurance Calculation system.
At the main screen one can enter information for a new client. The information to be provided consists of last name, first name and date of birth. After confirmation of the information, the system checks the age of the potential new client and calculates a proposed premium.
The system also has the option to request information for an existing client, using the client's ID number.
A keyword-driven automation approach is being used to automate most of the regression testing.
Based on the information provided, which TWO of the options provided would be the MOST LIKELY keywords for this application? (Choose two.)
A) Exclude_Client
B) Remove_Client
C) Print_Premium
D) Enter_Client
E) Select_Client
2. You are asked to provide a practical and pragmatic testing solution for a commercial system where the main user interface is via the Internet. It is critical that the company's existing good name and market profile are not damaged in any way. Time to market is not a critical issue when appropriate testing solutions are identified to mitigate business risks.
A product risk assessment has revealed the following product risk:
* Abnormal application termination due to connection failure of the main interface.
Which of the following is the appropriate test type to address this risk?
A) Portability testing
B) Performance efficiency testing
C) Reliability testing
D) Operability testing
3. Below is the pseudo-code for the Win program:
The bingo program contains a data flow anomaly. Which data flow anomaly can be found in this program?
A) Variable 'D" is defined but subsequently not used.
B) Variable 'A" is not assigned a value before using it.
C) The program does not contain any comments.
D) It is recommended to use a variable instead of the hard-coded print results "Win" and *Loose".
4. At which test level would performance efficiency testing most likely be performed?
A) Integration testing
B) System testing
C) User acceptance testing
D) Component testing
5. Subject to testing is a software system (COTS) for Project Administration and Control (PACS). PACS is a multi-project system for controlling the project time, e.g., in terms of scheduling and tracking, and managing the productivity of projects, e.g., in terms of effort and deliverables.
During various interviews with stakeholders the following information was gathered:
* Using PACS is not business critical. There is no impact such as high financial losses or problems to the operational continuity of an organization. Its application is not critical since the software package does not support directly the operational, or the primary, business processes of an organization. It supports (project) management in the project planning and tracking process. Of course, it will be highly annoying for users if the system "goes down" from time to time. Although this does not have a high impact for the business process as a whole, the Mean Time Between Failures (MTBF) still needs to be at a good level to be successful in the market.
* Users of PACS typically have an academic educational level, but have no prior experience with this particular type of project management software. The system will be used by a large number of users within an organization.
* The system will be used on a regular basis, e.g., several times per day by project managers and several times per week by project employees. This means that the system will not be used very intensively, often only for some data input or an information request. Its usage is not considered to be very time-critical.
* The data is recorded on-line and real-time. The system is expected to run in multiple hardware environments in various network environments. It is also expected that changes in the operational environments will happen in the upcoming period that also need to be supported.
Based on the information provided by the stakeholder, which combination of non-functional quality characteristics should you propose to test as part of your test approach?
A) Reliability and Portability
B) Security and Reliability
C) Reliability and Performance efficiency
D) Performance efficiency and Portability
Solutions:
| Question # 1 Answer: D,E | Question # 2 Answer: C | Question # 3 Answer: A | Question # 4 Answer: B | Question # 5 Answer: A |














512 Customer Reviews
Quality and ValueITCertKing Practice Exams are written to the highest standards of technical accuracy, using only certified subject matter experts and published authors for development - no all study materials.
Tested and ApprovedWe are committed to the process of vendor and third party approvals. We believe professionals and executives alike deserve the confidence of quality coverage these authorizations provide.
Easy to PassIf you prepare for the exams using our ITCertKing testing engine, It is easy to succeed for all certifications in the first attempt. You don't have to deal with all dumps or any free torrent / rapidshare all stuff.
Try Before BuyITCertKing offers free demo of each product. You can check out the interface, question quality and usability of our practice exams before you decide to buy.
