Oracle EBS R12: Advanced Supply Chain Planning Sample Questions:
1. The MSO:Enable Decision Rules profile option is set to "No." Then a Constrained but not Optimized plan Is run.
Identify three statements that are true.
A) Alternate Routings will not be considered.
B) Default Demand priorities will be considered in the order of Sales Order, Forecast, and Safety Stock.
C) Substitute items will be considered.
D) Alternate BOMs will not be considered.
E) Alternate BOMs will be considered.
2. You define a Supply Chain Plan of type "Master Plan."
In the main tabbed region of Plan Options, you select Planned Items as "All Planned Items" and select the Include Critical Components check box.
Which three describe the Items In the planned organizations that are selected by the plan?
A) all Items with the Planning Method Item Attribute of "MPS Planning" or "MPS/MPP Planned"
B) all Items with the Planning Method Item Attribute of "MRP/MPP Planned," "MPS/MPP Planned," or
"MPP Planned"
C) all Items EXCEPT the ones with the Planning Method Item Attribute set to "Not Planned"
D) Any Item that has a component with the Planning Method Item Attribute of "MRP/MPP Planned,"
"MPS/MPP Planned," or "MPP Planned" anywhere in its Supply Chain Bill. All sandwiched Items are also selected.
E) all critical Items and any assembly that has a critical component anywhere in its Supply Chain Bill. All sandwiched Items are also selected.
3. Exhibit.
In a manufacturing environment where Oracle Shop Floor Management Is used, the production process with Information about Yield (Yld), Net Planning Percent (NPP), Cumulative yield (CY), Reverse Cumulative Yield (RCY) is displayed for a product.
If the order quantity is 100, what is the raw material quantity and resource requirement ASCP will schedule respectively at operation sequence 10?
A) Raw material qty 117.63 and resource requirement for 113.63
B) Raw material qty 113.63 and resource requirement for 113.63
C) Raw material qty 97.37 and resource requirement for 117.63
D) Raw material qty 98 and resource requirement for 98
E) Raw material qty 100 and resource requirement for 100
4. Identify the user Interface for viewing data collected over to the planning server from the transaction Instances.
A) Operational Data Store (ODS)
B) Planner Workbench
C) Oracle Applications Data Store (ADS)
D) Standard Data Collection
E) Planning Data Store (PDS)
F) Collection Workbench
G) Continuous Data Collection
5. The following list contains possible places the Planning engine will check for Penalty Factors for Late Demand In an Optimized Plan:
1. At the Plan Option Level
2. Flexfield at the Item Level
3. At the System Profile Level
4. Flexfield at the Demand Level
5. Flexfield at the Organization Level
Identify the correct sequence.
A) 1, 2, 3, 4, 5
B) 3, 1, 5, 2, 4
C) 2, 4, 5, 3, 1
D) 4, 2, 5, 1, 3
E) 2, 5, 4, 1, 3
F) 4, 5, 2, 3, 1
Solutions:
| Question # 1 Answer: B | Question # 2 Answer: A,B,D | Question # 3 Answer: E | Question # 4 Answer: F | Question # 5 Answer: D |














1153 Customer Reviews
Quality and ValueITCertKing Practice Exams are written to the highest standards of technical accuracy, using only certified subject matter experts and published authors for development - no all study materials.
Tested and ApprovedWe are committed to the process of vendor and third party approvals. We believe professionals and executives alike deserve the confidence of quality coverage these authorizations provide.
Easy to PassIf you prepare for the exams using our ITCertKing testing engine, It is easy to succeed for all certifications in the first attempt. You don't have to deal with all dumps or any free torrent / rapidshare all stuff.
Try Before BuyITCertKing offers free demo of each product. You can check out the interface, question quality and usability of our practice exams before you decide to buy.